Case Study
Rainbow Lake Dam Restoration Project—Dahlonega
Location
65 R Ranch Road
Dahlonega, Georgia
Project Info
30′ high dam restoration including construction of a 2-acre island in lake from an on-site borrow pit., 36” concrete culvert pipe replacement, new concrete spillway, pedestrian walkway, and bridges with island construction.
Client: R-Ranch in The Mountains
Project Type: Dam Restoration
Headwaters Scope of Work: Erosion control, dam and keyway reconstruction, french drains, replacement of existing dam culvert piping and outlet control structure, concrete spillway construction, finish grading and final stabilization.
Contact Us
Call for more information: (770) 888-1956